Global blockchain supervision and query platform

English
Download

Bitcoin steadies as NY Fed, Michigan 1-yr surveys split

Bitcoin steadies as NY Fed, Michigan 1-yr surveys split WikiBit 2026-03-22 21:00

Final March one-year-ahead inflation expectations: NY Fed 3.6%; Michigan ~4.9%According to the federal reserve Bank of New York, the March Survey of

Bitcoin

Bitcoin steadies as NY Fed, Michigan 1-yr surveys split

Final March one-year-ahead inflation expectations: NY Fed 3.6%; Michigan ~4.9%

According to the federal reserve Bank of New York, the March Survey of Consumer Expectations put median one-year-ahead inflation expectations at 3.6%, a 0.5 percentage point rise from February. The same release indicated more stable views at longer horizons, near 3.0% at three years and 2.9% at five years.

as reported by CNBC, the University of Michigans one-year inflation expectation was about 4.9% in mid-March. The divergence underscores that near-term expectations can vary meaningfully across surveys even within the same month.

Why the New York Fed Survey of Consumer Expectations reading matters

Short-horizon consumer expectations influence wage setting, price sensitivity, and ultimately inflation persistence. A higher one-year outlook, if sustained, can complicate disinflation, while stability in multi-year horizons suggests longer-term anchors remain more intact.

Levels differ across surveys because of design, wording, and timing. Markets typically contextualize the New York Fed and Michigan readings together rather than treating either as definitive.

Recent official assessments emphasize continuity more than regime change. “Within the range that has prevailed since 2023,” said the U.S. Department of the Treasury in its April 30, 2025 report.

As reported by PANewsLab, the SOON project will suspend the soonBase L3 network on March 26 to redirect resources toward AI capital market development. The announcement asks users to withdraw assets via the official bridge before the shutdown date.

After the suspension, remaining assets will move to a team-controlled contract on Base, and withdrawals will require manual processing. The communication implies heightened verification needs around official channels to reduce phishing and contract spoofing risks.

soonBase official bridge verification and post-shutdown withdrawal stepsVerify official bridge URL and contract addresses before withdrawing

Verification reduces operational and phishing risk. Confirm the bridge URL from the project‘s primary announcement channel, cross-check contract addresses on a reputable block explorer, and compare message signatures against the project’s published identifiers.

Manual withdrawal process if assets remain after shutdown

Post-shutdown, withdrawals transition to manual case handling from the team-controlled contract on Base. Processing will depend on ownership verification and transaction records, and may introduce timing variability compared with automated bridging.

Disclaimer:

The views in this article only represent the author's personal views, and do not constitute investment advice on this platform. This platform does not guarantee the accuracy, completeness and timeliness of the information in the article, and will not be liable for any loss caused by the use of or reliance on the information in the article.

  • Crypto token price conversion
  • Exchange rate conversion
  • Calculation for foreign exchange purchasing
/
PC(S)
Current Rate
Available

0.00