Global blockchain supervision and query platform

English
Download

TeraWulf Missed Q4 Earnings: BTC Decline and HPC Transformation

TeraWulf Missed Q4 Earnings: BTC Decline and HPC Transformation WikiBit 2026-02-27 17:52

TeraWulf (WULF) missed its Q4 2025 earnings estimates. Due to the sharp drop in Bitcoin prices, mining revenue declined, reporting a 1,66 dollar loss per

The companys Q4 performance remained weak due to the dominant impact of BTC mining. The table below summarizes the key metrics:

MetricActualExpectation
Loss Per Share (EPS)-1,66 USD-0,16 USD
Quarterly Revenue35,8 M USD44,1 M USD
Digital Asset Revenue26,1 M USD
HPC Revenue9,7 M USD

Impact of Bitcoin Price Drop on Mining Costs

Bitcoin price fell from 125.000 dollars in October 2025 to 60.000 dollars in February 2026; currently at 67.993 USD level (%-0,28 24h change). TeraWulfs mining cost exceeded 87.310 USD, eroding profitability. BTC PERP contract rose %8,40 from the 62.401 USD low, turning the weekly candle positive, but the overall downtrend continues (RSI 42,76, Supertrend bearish).

TeraWulfs 2026 Vision with HPC and AI Contracts

The company targets 12,8 billion dollars in signed AI/HPC contracts for 2026. CEO Paul Prager said, “We are entering 2026 with 522 MW contracted HPC capacity and a 2,9 GW platform.” This is a strategic pivot reducing mining dependency.

Capacity Expansion: New Sites and Gigawatt Target

Capacity will increase by 1,5 GW with Kentucky (MISO) and Maryland (PJM) sites, reaching a total of 2,8 GW. This expansion will strengthen integrated HPC operations with BTC detailed analysis.

BTC Technical Levels and Miner Risk

EMA 20: 69.082 USD. Strong supports:

  • S1: 67.808 USD (72/100 ⭐, -0,22% distance)
  • S2: 64.323 USD (69/100 ⭐, -5,35%)

Resistances:

  • R1: 68.882 USD (82/100 ⭐, +1,36%)
  • R2: 78.917 USD (67/100 ⭐, +16,13%)

If S1 breaks, additional pressure increases for miners. BTC futures should be monitored.

Miners Transformation to AI/HPC and Sector Examples

GD Culture Group (GDC) is using its 7.500 BTC reserves for share buybacks, while companies like TeraWulf are shifting to HPC. This trend provides protection against BTC volatility.

Disclaimer:

The views in this article only represent the author's personal views, and do not constitute investment advice on this platform. This platform does not guarantee the accuracy, completeness and timeliness of the information in the article, and will not be liable for any loss caused by the use of or reliance on the information in the article.

  • Crypto token price conversion
  • Exchange rate conversion
  • Calculation for foreign exchange purchasing
/
PC(S)
Current Rate
Available

0.00